Description
We disconnect and cap water inlet and drain hoses, secure the drum for transport (especially for front-loaders), and move the machine. Re-installation involves leveling on a solid floor, reconnecting hoses, and running a test cycle to check for leaks and proper operation.







Reviews
There are no reviews yet.